Articles
Hereford Grid 132kV Substation Roof Refurbishment
LMC Roofing & Building Ltd completed the full refurbishment of the main roof at Hereford Grid 132kV Substation for National Grid Electricity. The existing roof was stripped back and replaced with a fully insulated, high-performance waterproofing system, including tapered insulation to improve drainage. Detailed planning and strict safety controls allowed the work to be completed safely within the live electrical environment.
How Much Value Does a Loft Conversion Add in Birmingham?
Loft conversions are a great way to extend your living space without having to move house.
What Are the Roof Tile Options?
Roofs are arguably the most important structural element of your home, keeping your property shielded from the elements.
What is Built-up Felt Roofing?
A tried and tested method of waterproofing flat and low-pitched roofs, Built-up felt roofing (BUR) is a roofing system that has been in use for many years.
Will Rubber Paint Waterproof a Roof?
Known for its versatility, rubber paint makes a great option for various surfaces from plastic pipes to brick walls…
What is Mastic Asphalt?
When you own a listed building, you own a piece of architectural history, so retaining its heritage and structural integrity is essential.